last sync: 2023-Jun-02 17:44:47 UTC

Azure Policy definition

Restore resources to operational state

Name Restore resources to operational state
Azure Portal
Id f801d58e-5659-9a4a-6e8d-02c9334732e5
Version 1.1.1
details on versioning
Category Regulatory Compliance
Microsoft docs
Description CMA_C1297 - Restore resources to operational state
Mode All
Type BuiltIn
Preview FALSE
Deprecated FALSE
Effect Default
Manual
Allowed
Manual, Disabled
RBAC
Role(s)
none
Rule
Aliases
Rule
ResourceTypes
IF (1)
Microsoft.Resources/subscriptions
Compliance The following 4 compliance controls are associated with this Policy definition 'Restore resources to operational state' (f801d58e-5659-9a4a-6e8d-02c9334732e5)
Control Domain Control Name MetadataId Category Title Owner Requirements Description Info Policy#
FedRAMP_High_R4 CP-10(4) FedRAMP_High_R4_CP-10(4) FedRAMP High CP-10 (4) Contingency Planning Restore Within Time Period Shared n/a The organization provides the capability to restore information system components within [Assignment: organization-defined restoration time-periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components. Supplemental Guidance: Restoration of information system components includes, for example, reimaging which restores components to known, operational states. Related control: CM-2. link 1
NIST_SP_800-53_R4 CP-10(4) NIST_SP_800-53_R4_CP-10(4) NIST SP 800-53 Rev. 4 CP-10 (4) Contingency Planning Restore Within Time Period Shared n/a The organization provides the capability to restore information system components within [Assignment: organization-defined restoration time-periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components. Supplemental Guidance: Restoration of information system components includes, for example, reimaging which restores components to known, operational states. Related control: CM-2. link 1
NIST_SP_800-53_R5 CP-10(4) NIST_SP_800-53_R5_CP-10(4) NIST SP 800-53 Rev. 5 CP-10 (4) Contingency Planning Restore Within Time Period Shared n/a Provide the capability to restore system components within [Assignment: organization-defined restoration time periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components. link 1
SWIFT_CSCF_v2022 9.2 SWIFT_CSCF_v2022_9.2 SWIFT CSCF v2022 9.2 9. Ensure Availability through Resilience Providers must ensure that the service remains available for customers in the event of a site disaster. Shared n/a Providers must ensure that the service remains available for customers in the event of a site disaster. link 13
History
Date/Time (UTC ymd) (i) Change type Change detail
2022-10-21 16:42:13 change Patch (1.1.0 > 1.1.1) *changes on text case sensitivity are not tracked
2022-09-27 16:35:32 change Minor (1.0.0 > 1.1.0)
2022-09-19 17:41:40 add f801d58e-5659-9a4a-6e8d-02c9334732e5
Initiatives
usage
Initiative DisplayName Initiative Id Initiative Category State Type
FedRAMP High d5264498-16f4-418a-b659-fa7ef418175f Regulatory Compliance GA BuiltIn
NIST SP 800-53 Rev. 4 cf25b9c1-bd23-4eb6-bd2c-f4f3ac644a5f Regulatory Compliance GA BuiltIn
NIST SP 800-53 Rev. 5 179d1daa-458f-4e47-8086-2a68d0d6c38f Regulatory Compliance GA BuiltIn
SWIFT CSP-CSCF v2022 7bc7cd6c-4114-ff31-3cac-59be3157596d Regulatory Compliance GA BuiltIn
JSON